STATE OF MISSION REPORT 2016 – COBRA ~ Jan. 2, 2016

Portal-2012-main-image-small

I could not resist posting this very short and sweet article posted by Cobra today on his website, http://www.portal2012.blogspotcom! Normally, these messages are encoded for the Light Resistance Movement, but I think the real meaning behind this message is clear. So… please join me as we prepare for victory celebrations over the dark forces (cabal, Illuminati, banksters), celebrate Light and Love, and…

InJoy!

Cobra in progress, Pandora in progress, multiple EXMOSS / EELA / ZEOLITE sequences in progress, BIOCHIP layer removal in progress, U96 / TOPAZ activated, ATLANTIS12  clear. Several systems / Isidic security breaches, all deflected, HVBN unstable towards stable. Two PB removal attempts with results pending. M minimum requirements met.

 

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.